INFRASTRUCTURE FOR SHEIKH KHALIFA HOUSING PROJECT, 204 HOUSING UNITS, HADRAMOUT, YEMEN

by xgo0xinfra | May 6, 2026 | 0 comments
INFRASTRUCTURE FOR SHEIKH KHALIFA HOUSING PROJECT, 204 HOUSING UNITS, HADRAMOUT, YEMEN

Infrastructure for
Sheikh Khalifa
Housing Project

204 Housing Units, Hadramout, Yemen
πŸ—οΈ

Contract Identification

Infrastructure for Sheikh Khalifa Housing Project, 204 housing units, Hadramout, Yemen

πŸ“…

Award Date, Implementation Period

July 2016, 20 months

βœ…

Actual Completion Date

February 2018

πŸ‘·

Role in Contract

Main Contractor βœ“

Sub-Contractor

Management Contractor

πŸ’°

Total Contract Amount

USD 3,634,535

Three million, six hundred thirty-four thousand, five hundred and thirty-five dollars

πŸ‘₯

If Partner in a JV, or Subcontractor, Specify Participation in Total Contract Amount

N/A

N/A

N/A

πŸ›οΈ

Employer's Name

Emirates Red Crescent

Zayed Sports City, Abu Dhabi, UAE

πŸ“‹

Description of the Similarity

Roads:

  • Design and construction of a road network within the Sheikh Khalifa Housing Project.
  • Works include concrete sidewalks, structural works, and drainage works for rain.

Water:

  • Design, supply, and installation of the main water supply network.
  • Works include associated elements such as valves, chambers, and meters.
  • Design, supply, and installation of the minor water supply network.
  • Works include valves, inspection chambers, and meters.

Wastewater:

  • Design, supply, and installation of the wastewater system.
  • Works include manholes, house connections, and service chambers.

Power:

  • Design, supply, and installation of the solar power supply network.
πŸ“

Physical Size

Roads:

  • An asphalt road network with 7m width and approximately 5 km total length.

Water:

  • Minor network of length 122 m consisting of UPVC pipes with diameters of 25, 50, 63, 90, and 110 mm.
  • HPPE primary major water network of length 97 m with diameters from 160 to 300 mm for the distribution network.
  • Number of valve chambers across the whole network: 5.
  • Number of washing chambers across the whole network: 70.

Wastewater:

  • A 5.656 km wastewater system of concrete pipes with diameters varying between 150 and 200 mm.

Power:

  • The solar power supply network consists of 204 units, 250 watt each.
πŸͺ™

Amount

Water and Wastewater:

  • The total cost of the water network works is USD 8,268.