DIALYSIS CENTER
by xgo0xinfra | May 6, 2026 | 0 comments
Dialysis Center
Hargeisa - Somalilandπ₯
Contract Identification
Dialysis Center in Hargeisa
π
Award Date, Implementation Period
2018
β
Actual Completion Date
July 2019
π·
Role in Contract
Main Contractor β
Management Contractor
π°
Total Contract Amount
421,836 USD
π₯
If Partner in a JV, or Subcontractor, Specify Participation in Total Contract Amount
N/A
N/A
N/A
ποΈ
Employer's Name
Engineering Office of HH Sheikh Mansour Bin Zayed
π
Description of the Similarity
Built Environment:
- Two connected buildings, including diagnostic rooms and 30 patient bedrooms with related facilities.
- Includes offices, a lab, and a small blood bank.
- Building outer fence 2m high.
External Works and Landscape:
- Pavement of curbstone for sidewalks and supply of grass.
- Implementation of tiled external stair.
Electrical Work:
- Installing LV systems including distribution boards, sockets, and switches.
- Providing lighting devices and cables.
- Installing phone and information network system.
- Supply and install CCTV.
- Supply and install fire alarm system.
- Supply and install standby power generation system.
Mechanical and Plumbing System:
- Implementing plumbing works for pipes and accessories.
- Installing sanitary and toilet accessories.
- Providing rainwater system.
- Supply 2000 L fiberglass water tank.
- Supplying and implementing electric heaters and AC units.
- Supplying fire extinguishing system.
πͺ
Amount
Buildings:
- The total cost of sub-structure, super structure construction, and finishing is USD 261,495.
External Works and Landscape:
- The construction cost of paved areas, green spaces, and hardscape works is USD 7,100.
MEP:
- The total cost of firefighting, plumbing, and HVAC works is USD 146,105.
π
Physical Size
Built Environment:
- Two connected buildings with 302 mΒ² area.
MEP:
- Above 10 air conditioning split units with max cooling and heating capacity of 2.5 ton.
- Firefighting systems containing 6 kg dry powder fire extinguishers.
π‘οΈ
Complexity
- The project site is located in the middle of the city with no storage location for material and equipment.
- Concrete casting had higher specifications and execution complexity due to LV and MV network healthcare requirements.
- The site was close to existing structures that required reinforcement to avoid cracks.
βοΈ
Methods / Technology
- Traditional construction process building methodology.
- Water supply and drainage networks required more detailed specifications due to the sensitivity of medical equipment.
- All medical equipment was imported to Somaliland.